Improving the river mouth of the Salado River – 1st stage.
Description
10 km canal opening to improve the river mouth of Salado river by dedging and refulado to embankments and construction of a bridge Hº Aº (light approx. 122 m) at the crossroads with Provincial Route 11.
Salado River dredging
Salado River dredging
Where
Buenos Aires, Argentina.
Work
Improving the river mouth of the Salado River – 1st stage.
Description
10 km canal opening to improve the river mouth of Salado river by dedging and refulado to embankments and construction of a bridge Hº Aº (light approx. 122 m) at the crossroads with Provincial Route 11.
Amount
9.508.517
Vol m3
52.000.000