Category Archives: Supercemento

Potabilisation Establishment Area Norte
  • Where

    Canalization Cañada Las Horquetas

  • Work

    Potabilisation establishment Noth Area.

  • Description

    Water Treatment Plant Paraná de las Palmas, Hydrant Dam Lujan, aqueducts: Río Luján Planta Tigre, Tigre Planta
    (Tiger center), Tigre Benavidez. Hydrant Parana de las Palmas, duct hydrant Parana de las Palmas.
    Tunnel Paraná de las Palmas – Dam Lujan Ø 3.600 L 14,650 m.

DOWNLOAD SUPERCEMENTO ACTIVITIES

Canalization Cañada Las Horquetas
  • Where

    Canalization Cañada Las Horquetas

  • Work

    Canalization ravine Las Horquetas. Stage III- 2nd tract.

  • Description

    Channel flood evacuation.

  • Amount

    4.448.814

DOWNLOAD SUPERCEMENTO ACTIVITIES

Hidroelectric complex Yacyreta
  • Where

    Argentina – Paraguay.

  • Work

    Hidroelectric complex Y-C1 contract: principal dam construction, hidroelectrical central and complementary works.

  • Description

    Dam and sides dams of compact filled over Paraná river with navigation lock, landfill for 55,00 m3/seg. Flow and hidroelectrical central with 20 U. 160,000 Kw each one generator.

  • Amount

    1.429.000.000

DOWNLOAD SUPERCEMENTO ACTIVITIES

Acueduct Centro Oeste
  • Where

    Snata Fe, Argentina

  • Work

    Centro Oeste aqueduct construction.

  • Description

    Digging for foundations: 325,000 m3.
    Filling soil: 244,900 m3.
    Concrete: w / Elem. premolded: 854m3.
    Concrete structures: 8,560 m3.
    Water treatment plant capacity: 242 1 / sec.
    Intake works, Hº Aº viaduct 250 m long and forebay

  • Amount

    47.687.750

DOWNLOAD SUPERCEMENTO ACTIVITIES