• Where

    Buenos Aires, Argentina.

  • Work

    Adequacy of the Salado river Section. 3rd track Sector III

  • Description

    Consisted on the excavations of margins and dredging the riverbed of the Salado River, between survey of 223,918 km to 285,518 km, excavation with backhoes and dredges, and transport to venues for the final disposal of soils.

  • Amount

    58.110.250

DOWNLOAD PENTAMAR ACTIVITIES