Adequacy of the Salado river Section. 3rd track Sector III
Description
Consisted on the excavations of margins and dredging the riverbed of the Salado River, between survey of 223,918 km to 285,518 km, excavation with backhoes and dredges, and transport to venues for the final disposal of soils.
Rio Salado dredging
Rio Salado dredging
Where
Buenos Aires, Argentina.
Work
Adequacy of the Salado river Section. 3rd track Sector III
Description
Consisted on the excavations of margins and dredging the riverbed of the Salado River, between survey of 223,918 km to 285,518 km, excavation with backhoes and dredges, and transport to venues for the final disposal of soils.
Amount
58.110.250