Mes: marzo 2016

Rio Salado dredging
  • Where

    Buenos Aires, Argentina.

  • Work

    Adequacy of the Salado river Section. 3rd track Sector III

  • Description

    Consisted on the excavations of margins and dredging the riverbed of the SaladoRiver, between survey of 223,918 km to 285,518 km, excavation with backhoes and dredges, and transport to venues for the final disposal of soils.

  • Amount

    40.000.000

DOWNLOAD PENTAMAR ACTIVITIES

Rock Drilling in Claro River
  • Where

    San Luis, Argentina.

  • Work

    Rock Drilling in Claro River.

  • Description

    Rock drilling performance for the foundations treatment; perforations were made rotopercussion, in various diameters, with different inclinations and different depths, in order to perform consolidation injections; waterproofing; and anchors.

  • Amount

    5.546.000

DOWNLOAD PENTAMAR ACTIVITIES

Coaster Ave. Ciudad de Concepción
  • Where

    Entre Ríos, Uruguay.

  • Work

    Construction of Coaster Ave.

  • Description

    Dredging the Uruguay River, a navigable section of the river; and refulado of dredged material for an embankment construction of the on the trace to settle the coastal avenue, refulado a distance of approximately 1,500 meters.

  • Amount

    32.452.315

DOWNLOAD PENTAMAR ACTIVITIES

Rio Salado dredging
  • Where

    Buenos Aires, Argentina.

  • Work

    Adequacy of the Salado river Section. 3rd track Sector III

  • Description

    Consisted on the excavations of margins and dredging the riverbed of the Salado River, between survey of 223,918 km to 285,518 km, excavation with backhoes and dredges, and transport to venues for the final disposal of soils.

  • Amount

    58.110.250

DOWNLOAD PENTAMAR ACTIVITIES

Salado River
  • Where

    Buenos Aires, Argentina.

  • Work

    Inferior Salado River adequacy. Chascomús – Pila y Gral. Belgrano

  • Description

    Inferior Salado River adequacy – Laguna Barrancas (Progresiva Km. 115) – Arroyo Los Poronguitos (Progresiva Km. 172) Section.

  • Amount

    161.755.814

  • Vol m3

    12.000.000

DOWNLOAD PENTAMAR ACTIVITIES

Port Bahía Blanca
  • Where

    Bahía Blanca, Buenos Aires, Argentina

  • Work

    Maintenance dredging of Puerto de Bahía Blanca.

  • Description

    Maintenance dredging of the main channel nautical conditions, access channel and maneuvering area of the estuary of Bahia Blanca – Reinstalling beacons and tidal gauge tower

  • Amount

    24.662.220

  • Vol m3

    18.000.000

DOWNLOAD PENTAMAR ACTIVITIES

Dump Parque Bragado
  • Where

    Laguna de Bragado, Buenos Aires, Argentina.

  • Work

    Construction work: dump Laguna del Parque Bragado – Partido de Bragado

  • Description

    Dredging Laguna y Río Bragado. Metalic sheet piling – Dump works A° Bragado

  • Amount

    11.124.603

  • Vol m3

    370.000

DOWNLOAD PENTAMAR ACTIVITIES

Gas Plant YPF
  • Where

    Escobar, Buenos Aires, Argentina.

  • Work

    Dredging Gas Plant YPF.

  • Description

    Dredging in docking area over the coast with shore protection on Escobar area and corresponding maneuvering area in the river Paraná.

  • Amount

    6.911.588

  • Vol m3

    385.000

DOWNLOAD PENTAMAR ACTIVITIES

Port Piriápolis
  • Where

    Piriápolis, Uruguay.

  • Work

    Extension of Puerto Piriápolis.

  • Description

    Extension and construction of the port with stone breakwaters, concrete walls and complementary works.
    It includes dock extension for Buquebús entry and exit.

  • Amount

    19.526.204

DOWNLOAD DYOPSA ACTIVITIES

Canal Martín García dredging
  • Where

    Buenos Aires, Argentina.

  • Work

    Re-dredging of Canal Emilio Mitre (Km 12 to 43,5).

  • Description

    Material extraction (8,5 millions m3)in order to permit restoration of the operating conditions of the channel.

  • Amount

    35.000.000

  • Vol m3

    12.500.000

DOWNLOAD DYOPSA ACTIVITIES