Category Archives: Frontera

Rio Salado dredging
  • Where

    Buenos Aires, Argentina.

  • Work

    Adequacy of the Salado river Section. 3rd track Sector III

  • Description

    Consisted on the excavations of margins and dredging the riverbed of the SaladoRiver, between survey of 223,918 km to 285,518 km, excavation with backhoes and dredges, and transport to venues for the final disposal of soils.

  • Amount

    40.000.000

DOWNLOAD PENTAMAR ACTIVITIES

Rock Drilling in Claro River
  • Where

    San Luis, Argentina.

  • Work

    Rock Drilling in Claro River.

  • Description

    Rock drilling performance for the foundations treatment; perforations were made rotopercussion, in various diameters, with different inclinations and different depths, in order to perform consolidation injections; waterproofing; and anchors.

  • Amount

    5.546.000

DOWNLOAD PENTAMAR ACTIVITIES

Coaster Ave. Ciudad de Concepción
  • Where

    Entre Ríos, Uruguay.

  • Work

    Construction of Coaster Ave.

  • Description

    Dredging the Uruguay River, a navigable section of the river; and refulado of dredged material for an embankment construction of the on the trace to settle the coastal avenue, refulado a distance of approximately 1,500 meters.

  • Amount

    32.452.315

DOWNLOAD PENTAMAR ACTIVITIES

Rio Salado dredging
  • Where

    Buenos Aires, Argentina.

  • Work

    Adequacy of the Salado river Section. 3rd track Sector III

  • Description

    Consisted on the excavations of margins and dredging the riverbed of the Salado River, between survey of 223,918 km to 285,518 km, excavation with backhoes and dredges, and transport to venues for the final disposal of soils.

  • Amount

    58.110.250

DOWNLOAD PENTAMAR ACTIVITIES